Skip to content

relax requirement for patch size and config for llava preprocessor #4729

relax requirement for patch size and config for llava preprocessor

relax requirement for patch size and config for llava preprocessor #4729

Triggered via pull request February 5, 2025 10:47
Status Failure
Total duration 1h 12m 36s
Artifacts

test_ipex.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (4.47.1, 2.4.0)
Process completed with exit code 1.
build (4.47.1, 2.5.*)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (4.47.1, 2.5.*)
The operation was canceled.
build (4.47.0, 2.5.*)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (4.47.0, 2.5.*)
The operation was canceled.