Skip to content

Relax requirement for patch size and config for llava preprocessor (#… #4735

Relax requirement for patch size and config for llava preprocessor (#…

Relax requirement for patch size and config for llava preprocessor (#… #4735

Triggered via push February 5, 2025 14:31
Status Failure
Total duration 1h 30m 43s
Artifacts

test_ipex.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (4.47.1, 2.4.0)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (4.47.1, 2.4.0)
The operation was canceled.
build (4.47.0, 2.4.0)
Process completed with exit code 1.
build (4.47.1, 2.5.*)
Process completed with exit code 1.