Skip to content

add the --shm-size parameter at runtime (#1972) #2016

add the --shm-size parameter at runtime (#1972)

add the --shm-size parameter at runtime (#1972) #2016

Triggered via push February 1, 2024 15:52
Status Failure
Total duration 18m 3s
Artifacts 3

ci-tests.yml

on: push
No leftovers
4m 24s
No leftovers
cwltool release test
17m 48s
cwltool release test
build_test_container
9m 29s
build_test_container
Test on macos-latest
8m 42s
Test on macos-latest
Matrix: CWL conformance
Matrix: Linters
Matrix: Tox
Fit to window
Zoom out
Zoom in

Annotations

16 errors
CWL conformance (v1.1, docker)
Process completed with exit code 1.
CWL conformance (v1.1, podman)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.1, podman)
The operation was canceled.
CWL conformance (v1.2, podman)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.2, podman)
The operation was canceled.
CWL conformance (v1.2, singularity)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.2, singularity)
The operation was canceled.
CWL conformance (v1.2, docker)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.2, docker)
The operation was canceled.
CWL conformance (v1.1, singularity)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.1, singularity)
The operation was canceled.
CWL conformance (v1.2, docker, --fast-parser)
The job was canceled because "v1_1_docker" failed.
CWL conformance (v1.2, docker, --fast-parser)
The operation was canceled.
Tox (3, 9, mypy)
Process completed with exit code 1.
Tox (3, 8, mypy)
The job was canceled because "_3_9_mypy" failed.
Tox (3, 8, mypy)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cwl-v1.0-docker-conformance-results Expired
2.92 KB
cwl-v1.0-podman-conformance-results Expired
2.91 KB
cwl-v1.0-singularity-conformance-results Expired
3.04 KB