Update gatling-sbt to 4.10.0 (#220) #585
Annotations
8 errors
unit_test
Canceling since a higher priority waiting request for 'refs/heads/master-Continuous Integration' exists
|
unit_test
The operation was canceled.
|
compile
Canceling since a higher priority waiting request for 'refs/heads/master-Continuous Integration' exists
|
compile
The operation was canceled.
|
format
Canceling since a higher priority waiting request for 'refs/heads/master-Continuous Integration' exists
|
format
The operation was canceled.
|
lint
Canceling since a higher priority waiting request for 'refs/heads/master-Continuous Integration' exists
|
lint
The operation was canceled.
|