Skip to content

Testing/manager

Testing/manager #589

Triggered via pull request November 26, 2024 16:31
Status Failure
Total duration 11m 8s
Artifacts

push-pr_workflow.yml

on: pull_request
CHANGELOG.md updated
6s
CHANGELOG.md updated
Lint
1m 4s
Lint
Matrix: Integration-tests
Matrix: Local-test-suite
Matrix: Unit-tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Integration-tests (3.7)
Process completed with exit code 1.
Integration-tests (3.11)
The job was canceled because "_3_7" failed.
Integration-tests (3.11)
The operation was canceled.
Integration-tests (3.10)
The job was canceled because "_3_7" failed.
Integration-tests (3.10)
The operation was canceled.
Integration-tests (3.8)
The job was canceled because "_3_7" failed.
Integration-tests (3.8)
The operation was canceled.
Integration-tests (3.9)
The job was canceled because "_3_7" failed.
Integration-tests (3.9)
The operation was canceled.