setup initial fixtures and test file #587
push-pr_workflow.yml
on: push
CHANGELOG.md updated
0s
Lint
27s
Matrix: Integration-tests
Matrix: Local-test-suite
Matrix: Unit-tests
Annotations
20 errors
Lint
Process completed with exit code 1.
|
Unit-tests (3.8)
Process completed with exit code 2.
|
Unit-tests (3.9)
The job was canceled because "_3_8" failed.
|
Unit-tests (3.9)
Process completed with exit code 2.
|
Unit-tests (3.10)
The job was canceled because "_3_8" failed.
|
Unit-tests (3.10)
The operation was canceled.
|
Unit-tests (3.11)
The job was canceled because "_3_8" failed.
|
Unit-tests (3.11)
The operation was canceled.
|
Unit-tests (3.7)
The job was canceled because "_3_8" failed.
|
Unit-tests (3.7)
The operation was canceled.
|
Integration-tests (3.8)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
Integration-tests (3.8)
The operation was canceled.
|
Integration-tests (3.9)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
|
Integration-tests (3.9)
The operation was canceled.
|
Integration-tests (3.10)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
Integration-tests (3.10)
The operation was canceled.
|
Integration-tests (3.11)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
Integration-tests (3.11)
The operation was canceled.
|
Integration-tests (3.7)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
Integration-tests (3.7)
The operation was canceled.
|