Skip to content

Update x86-noble

Update x86-noble #2606

Triggered via push January 19, 2025 17:26
Status Cancelled
Total duration 12m 30s
Artifacts 2

eventbuild.yml

on: push
Matrix: build
Matrix: createEmmcImage
Matrix: upload
Fit to window
Zoom out
Zoom in

Annotations

12 errors and 1 warning
build (x86-noble)
Process completed with exit code 1.
build (qcs405)
Process completed with exit code 1.
build (radxa-cm3)
The run was canceled by @raphaelscholle.
build (radxa-cm3)
The operation was canceled.
build (rock5a)
The run was canceled by @raphaelscholle.
build (rock5a)
The operation was canceled.
build (radxa-zero3w)
The run was canceled by @raphaelscholle.
build (radxa-zero3w)
The operation was canceled.
build (rock5b)
The run was canceled by @raphaelscholle.
build (rock5b)
The operation was canceled.
build (pi-bullseye)
The run was canceled by @raphaelscholle.
build (pi-bullseye)
The operation was canceled.
build (radxa-cm3)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 99 MB

Artifacts

Produced during runtime
Name Size
x20-01-19-2025-18-27-15 Expired
1.66 GB
x86-minimal-01-19-2025-18-27-21 Expired
2.58 GB