Fix initial velocities and tests #221
ci.yml
on: push
Matrix: tests
docs
1m 56s
pre-commit
2m 29s
coverage
0s
Annotations
7 errors
tests (3.9)
Process completed with exit code 1.
|
tests (3.12)
The job was canceled because "_3_9" failed.
|
tests (3.12)
The operation was canceled.
|
tests (3.10)
The job was canceled because "_3_9" failed.
|
tests (3.10)
The operation was canceled.
|
tests (3.11)
The job was canceled because "_3_9" failed.
|
tests (3.11)
The operation was canceled.
|